Free Construction Excel Templates for Indian Sites
Free Excel formats that site engineers, contractors and interior firms ask for most. Every file is a real .xlsx with working formulas, no sign-up and no email needed. Download, rename and start using it on site today.
DPR format (Daily Progress Report)
One A4 sheet with nine sections: project details, manpower planned against present, work done, material received and consumed, progress against plan, issues, tomorrow’s plan, photos and sign-off. Shortfall above 15% and issues open more than 7 days turn red on their own.
BOQ format (Bill of Quantities)
Seven columns, ten standard sections from earthwork to external works, automatic amounts, section sub-totals, GST and grand total. A second sheet holds rate analysis blocks with wastage, overhead and profit so every unit rate can be explained.
Labour attendance sheet (hajiri register)
Monthly muster for 40 workers. Mark P, H, A or L for each day. The sheet counts present days, half days and absents, adds overtime, subtracts advance and shows the net amount payable for each worker.
Material stock register
List your materials once, then enter every receipt and issue as one row. Received, issued and balance quantities update on their own, and any item at or below its minimum level is marked for reorder.
Material indent format
A numbered indent form with item, specification, unit, quantity required, stock in hand and an automatic quantity to order, plus written approvals. An indent log marks each line pending, approved, part received, closed or late.
What each file looks like once filled
Sample figures, the same ones used in each guide, so you can check the formulas after you download.
| Template | You type | The sheet works out |
|---|---|---|
| DPR format | Masons planned 10, present 7 | Shortfall 3, 30%, marked red (above 15%) |
| BOQ format | 10 cum at Rs 250 | Amount Rs 2,500, section totals, GST and grand total |
| Labour attendance | Ramesh, Rs 600/day: P, P, H, A; 4 OT hours at Rs 100; Rs 500 advance | 2.5 payable days, gross Rs 1,900, net Rs 1,400 |
| Stock and issue register | Cement: opening 10, received 100, issued 95, minimum 20 | Balance 15, status REORDER |
| Material indent | Cement required 120, stock in hand 35 | Quantity to order 85 |
How to use these templates
- Keep one master copy. Save the downloaded file as a master and make a copy for each site or each month. Never fill the master.
- Name files the same way every time. For example DPR_SiteName_2026-10-10.xlsx. Six months later this is the only way you will find anything.
- Do not type over formula cells. Amounts, totals, balances and wages are calculated. If a number looks wrong, fix the quantity, rate or entry behind it.
- Fix a daily deadline. A DPR or stock entry filled the next morning is a guess. Fill it before leaving site.
When Excel stops being enough
Excel works well for one site with a disciplined site engineer. It starts to hurt when you run three or more sites, because every sheet lives on a different phone, nobody can see today’s numbers without calling someone, and attendance, material and payments sit in separate files that never agree with each other.
That is the gap Trackovo fills. The same information goes in from the phone on site: attendance with photo and location, material requests, receipts and issues, daily progress and payments. The owner sees every site in one place. If the templates are working for you, keep using them. When they stop working, try Trackovo free for 14 days.
Common questions
Is there a material issue register format?
Yes. The material stock register doubles as the issue register: every issue is one row in its Entries sheet, and the balance updates on its own. The stock and issue register guide shows a filled example.
Which template should I start with?
Start with the one where you lose the most money today. For most sites that is the labour attendance sheet (wage disputes) or the stock register (missing material). Add the DPR once those two are filled every day.
Are these templates really free?
Yes. There is no sign-up, no email form and no watermark. You can edit them, print them and share them with your team or your contractors.
Will they open on a phone?
Yes. They open in Microsoft Excel, Google Sheets and WPS Office on Android and iPhone. The dropdowns and formulas work in all three.
Can I change the trades, materials or BOQ items?
Yes. The sample trades, materials and BOQ lines are only examples. Type over them with your own. Keep the formula columns as they are.
Which units do the templates use?
Standard Indian site units: cum, sqm, rmt, kg, no., bag and MT. Amounts are in rupees.
Frequently asked questions
Which Excel templates does a construction site need every day?
Three are daily: the DPR, the labour attendance sheet and the material stock register. The DPR records what was done, the attendance sheet records who was there, and the stock register records what came in and what went out. The BOQ is prepared once per project and updated when the scope changes, and the material indent is raised whenever stock falls below its minimum level.
How do I make a daily progress report in Excel?
Use the DPR format above. It has nine sections on one A4 sheet: project details, manpower planned against present, work done, material received and consumed, progress against plan, issues, tomorrow’s plan, photos and sign-off. Fill it before leaving site, save one file per day with the date in the name, and send it to the office. The DPR format guide walks through each section.
Is there an Excel format for site expenses or petty cash?
Not in this download set yet, but the structure is simple: date, paid to, purpose, amount, paid by, bill or voucher number and a running balance. Our guides on the site expense register format and the petty cash register for construction sites show the columns and the rules that stop daily kharcha from turning into month-end arguments.
When should a contractor move from Excel templates to an app?
When you run two or more sites, or when attendance, material and payments live in files that never agree with each other. At that point every sheet is on a different phone and the owner has to call someone to learn today’s numbers. Trackovo puts attendance, material, daily progress and payments in one app on the phone, with a 14-day free trial and no card needed.
More free construction formats in Excel (added November 2026)
Each file has a blank form and a filled sample sheet. Formulas are checked. Open the guide, then download from the box at the top.
- RA bill format – running account bill with BOQ check and deductions
- Measurement book (MB) format – nos x L x B x D with a per-item summary
- Work order format – contractor scope, items, terms and GST total
- Muster roll format – 31-day P/H/A/L register with wages
- Petty cash register – vouchers, running balance, head-wise summary
- GRN format – goods received note with FULL / SHORT / EXCESS log
- Labour advance register – advances, recoveries and balances
- Cement register format – daily bags with theoretical consumption and variance