Material Management

Every Bag, Every Kilo, Every Rupee — Tracked

Request → PO → GRN → issue → consume. One end-to-end workflow. Material chori band.

Material Store

Sample data
Cement OPC
430 bag
TMT 12mm
8.2 T
Tiles 600
240 box
Sand
18 T
Sample data for illustration, not from a real site
Where It Leaks

Four Ways Material Walks Off Site

Material that goes missing without a record is never recovered. Silently.

Shrinkage nobody notices

3–5% of cement, TMT, tiles “disappear” every month. Storekeeper calls it an adjustment.

Delivery vs challan mismatch

430 bags ordered, 405 actually delivered, challan signed for 430. Nobody counts at the gate.

Indent chaos on WhatsApp

Supervisor sends voice note. Partner approves. Purchase person forgets. Material arrives late.

BOQ vs actual drift

You estimated 500 bags for the slab. Used 580. Never reconciled against the BOQ. Next project repeats the mistake.

One Platform

Every Material Entry, Tagged And Tracked

Trackovo connects the entire material lifecycle on one screen. From the indent your site engineer raises on his phone to the vendor bill your accountant clears, every step is linked, logged, and audit-grade.

  • ✓Photo-verified GRN at the gate, matched automatically to the open PO
  • ✓Live stock ledger — received, issued, consumed, in store, on any device
  • ✓Site-to-site material transfer with approval and audit trail
  • ✓BOQ reconciliation with variance alerts on over-consumption

Material Store

Sample data
Cement OPC
430 bag
TMT 12mm
8.2 T
Tiles 600
240 box
Sand
18 T
Sample data for illustration, not from a real site
Inside The Module

The Full Material Lifecycle

From the moment your engineer needs material to the moment you pay the vendor bill.

Material Store

Sample data
Cement OPC
430 bag
TMT 12mm
8.2 T
Tiles 600
240 box
Sample data for illustration, not from a real site
Request

Material Indent

Site engineer raises a request in 30 seconds. Multi-level approval with SLA timer.

Petty Cash

Sample data
Diesel
₹3,200
Tempo fare
₹1,800
Unloading
₹850
Sample data for illustration, not from a real site
Order

Purchase Order

POs auto-generated from approved indents with vendor credit terms and delivery window.

Material Store

Sample data
Cement OPC
430 bag
TMT 12mm
8.2 T
Tiles 600
240 box
Sample data for illustration, not from a real site
Receive

GRN + Photo Proof

Photo of the bags at the gate, challan scan, auto-match to PO quantity.

Today's Overview

Sample data
Active sites
12
Labour on-site
248
Material used
₹2.1L
Sample data for illustration, not from a real site
Issue

Stock Ledger

Live balance per material per site. Issues tagged to work activity and engineer.

Active Projects

Sample data
Sky Heights
78%
Green Park
42%
Ocean View
91%
Sample data for illustration, not from a real site
Transfer

Site-To-Site

Move cement from Site A to Site C with approval. No more informal “borrowing”.

This Month

Sample data
Labour cost
₹8.2L
Material
₹12.4L
Expenses
₹3.1L
Sample data for illustration, not from a real site
Reconcile

BOQ Match

Monthly reconciliation against BOQ. Over-consumption flagged with variance %.

Getting Started

How To Get Started

1

Book a 20-min demo

We walk through your current workflow with your own numbers.

2

We set up your first site

Project, budget, vendors and team — added in one call. No consultants.

3

Your team starts logging

Supervisors begin attendance, material, and expense entries the same week.

Plain Facts

What Every Plan Includes

14 days
Free trial, no card

Try it on one live site before you pay anything.

All modules
On every plan

Plans differ only in the number of core users and active projects, not in features.

Free
Labour and contractor logins

Labour, contractors and staff log in free and unlimited on every plan; only office and site roles count as users.

Common Questions

Frequently Asked

Does the GRN require a physical device or printer?
No. Your storekeeper uses his own Android phone. Scan the challan number, snap a photo, confirm quantity — done in 40 seconds.
Can I track material across multiple sites from one dashboard?
Yes. Company-wide material dashboard shows stock, consumption and variance for every active site.
How does it prevent material theft?
Photo proof at gate + tagged issue to work activity + BOQ variance alerts. Every anomaly surfaces the same day, not the same quarter.
Can I set low-stock reorder alerts?
Yes. Set reorder thresholds per material per site. Trackovo notifies the purchase team automatically.
Does it integrate with my existing vendors?
Yes. Vendor master lives in Trackovo. You can also invite vendors to update delivery status via a free portal.

Stop Losing Lakhs To Silent Shrinkage

20-minute walkthrough of Trackovo using one of your real project’s numbers. No sales pitch.

Book Demo

In short: Trackovo material management covers the whole chain on a construction site: the supervisor raises a material request on the phone, the owner approves it, a purchase order goes to the vendor, the delivery is received with quantity and proof, and the stock ledger per site and store updates on its own. Transfers between store and site, returns and consumption are all recorded, so every bag of cement and every rod of steel has a trail.

Frequently asked questions

How does Trackovo track construction materials?

Each material moves through request, approval, order, delivery and consumption, and every step is recorded against the site and the person who entered it. The stock ledger shows what was received, what was used and what remains, per site and per store, with transfers between them.

Can Trackovo stop material theft on site?

No app can stop theft by itself, but Trackovo makes leakage visible: requested, approved, received and consumed quantities are all on record, and the owner sees the difference. Most leakage happens where there is no record, which is exactly what the app removes.

Does Trackovo keep vendor rates and purchase history?

Yes. Every purchase order and delivery is linked to the vendor, so you can see rate history, outstanding dues and settlements per vendor in the vendor module.

How much does Trackovo cost?

Trackovo publishes its prices, currently with a 70% launch offer: Starter is ₹1,799 per month or ₹17,999 per year for 3 core users and 5 active projects; Growth is ₹2,999 per month or ₹29,999 per year for 6 core users and 12 projects; Scale is for larger builders. 18% GST is extra. Every module is included in every plan, only the limits differ; labour, contractors and staff log in free and unlimited on every plan, and every new workspace starts with a 14-day free trial that needs no card.

TRACKOVO • Build. Track. Profit.

Choose your region
© 2026 Trackovo. All rights reserved. Privacy Policy Terms of Service Contact
Scroll to Top