Multi-Project Builder Control

Control 5, 10 or 20 Projects From One Dashboard

You grew from 1 project on energy and phone calls. Then your system stopped scaling. Trackovo is the operating backbone Indian builders use to run 20 sites with the clarity they had at 1.

1 → 20
Projects on one dashboard
₹15–40L
Typical annual savings
20+ hrs
Owner time recovered weekly
4 weeks
Full company onboarding
The Reality

Why Builders Collapse Between Project 3 And Project 6

At 1 project, you’re the engineer, PM, purchase head and owner. Nothing is documented because nothing needs to be.

At 4–5 projects you can’t translate anymore. You miss things. Small issues become big issues. You hire a “project coordinator” to collate reports. He becomes a bottleneck and quits after 6 months.

At 6+, every project is silently over budget. You only find out at closing. You fire engineers, hire new ones, same mistakes. Nothing is documented, so nothing is fixable.

Your business can only grow to the size of your personal attention span — unless the system enforces the standard.
Where It Breaks

Where Multi-Project Builders Bleed

Inconsistent data across sites

Site A reports “60% complete.” Site B reports “200 rm done.” Site C sends a photo. You can’t compare. You can’t spot the outlier.

Silent material diversion

40 bags move from Site A to Site C informally. Looks like theft in A and surplus in C. Nobody catches it without a central store system.

Budget creep nobody catches

With 5 projects running, a single over-budget site is easy to miss for 6 weeks. By then you’ve lost 8–10% permanently.

Staff performance you can’t measure

Which engineer is the best? You have no data. You promote based on who talks to you most — rarely the same as who performs best.

The Control System

How Trackovo Runs Multi-Project Builders

Enforces a single standard across every site, then rolls them up so comparison is effortless.

Labour

Every site engineer logs labour the same way. Compare productivity per sqm across projects — spot the outlier in seconds.

Material

Central store control with site-level visibility. Inter-site transfers documented with approvals. “Borrowing” becomes visible.

Expenses

Each project has its own budget P&L. Company-level dashboard shows them all at once — red flags first.

Reports

Owner dashboard ranks projects by health. Drill into the red ones. Stay out of the green ones. Run on exceptions, not on everything.

Live Control

All Your Projects. One Screen. One Standard.

Cost per sqft, days per floor, material consumption per unit — benchmarked, comparable, live.

Today’s Labour

Live
Mistry
42
Helper
68
Bar Bender
12
Carpenter
8
Payable today ₹1,08,500

Live Material

GRN
Cement OPC 43
430 rec · 405 used
+25
TMT 12mm
8.2 T rec · 7.8 T used
+0.4 T
Tiles 600×600
240 rec · 232 used
+8
Binding Wire
42 kg rec · 38 kg used
+4 kg
Consumed today ₹2,14,850

Active Alerts

3 New
Plastering over 80%
₹6.4L of ₹8L budget
Site 2 DPR missing
Engineer Ramesh · 6:10 PM
Cement stock low
25 bags left · reorder sent
Slab 2F complete
On schedule · 4:22 PM
Total alerts 12
Real Numbers

What A Builder Saves

₹15–40L
annual leak prevention

5–8 project builder — labour and material leaks plugged across the portfolio.

20+ hrs
owner time recovered weekly

From “always fighting fires” to “thinking about the next land deal.”

2 seconds
to spot the outlier project

Red-flag site shows up instantly. You react same day, not same quarter.

Real Story

A Meerut Builder With 6 Projects

M
Meerut residential builder

Team of 6 engineers, each doing things his own way. Owner was on 40+ WhatsApp messages before 9 AM every day.

First month on Trackovo, dashboard showed 2 of the 6 projects were trending 12% over budget. Owner reallocated his best PM, caught a ₹4.8 lakh labour contractor over-billing, and salvaged both margins.

₹22L
First-year savings
40 → 8
Morning WhatsApps
30 min
Daily reporting time

“Ab subah ka first hour land deals pe jaata hai, crisis management pe nahi.”

Common Questions

Frequently Asked

Can I add projects as my business grows?
Yes. Add projects anytime. Pricing scales linearly, no per-user charges, no lock-in.
Different templates for residential vs commercial?
Yes. Each project type has its own DPR template, budget structure and cost head chart.
Can site teams be restricted to their own project?
Yes. Role-based access ensures Site A’s engineer can’t see Site B’s data. Only managers and owners see the company rollup.
Can I compare projects against each other?
Yes. Company-level dashboard has built-in benchmarks — cost per sqft, days per floor, material per unit.
Do I have to migrate all projects at once?
No. Start with your 2 most problematic projects. Add the rest as you get comfortable. Most builders finish full migration in 3–4 weeks.

Finally See All Your Projects At Once

20 minutes and we’ll show your rollup dashboard with sample data from your own projects.

Scroll to Top